Adaptec RS Series Podręcznik Użytkownika Strona 21

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 51
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 20
2-5
Unpacking and Initial Setup
Securely attach one end of the cable to the barrel of the 2-hole ground lug.
Using the two M5x8 metal screws, attach the 2-hole ground lug and 6 AWG
ground wire to the disk shelf. Do not overtighten the screws.
Connect the opposite end of the 6-AWG grounding wire to the appropriate
grounding point at your site, ensuring an adequate chassis ground.
WARNING: Prior to the interconencting of a shelf to any other equipment
or cabling, the shelf must be properly grounded. Should the connection to
ground require removal for any purpose, ensure that all other interconnect-
ing cables are removed first and such cables are not replaced until after the
ground is re-connected.
Device Insertion
This section details how to install power supply units, disk drives, and Advanced
Cooling Modules (ACMs). The installation of a RAIDStation7 rackmount Stor-
age Array is shown below. For the tower version of the RAIDStation7 Storage
Array, Figure 2-3 would be oriented vertically, with bay 0 on top and bay 8 on the
bottom.
Figure 2-3. Location of devices in tower or shelf
WARNING: Before attempting to install or remove any of the components,
ensure that anti-static precautions have been taken. The minimum require-
ment is an anti-static wrist strap and grounding wire.
Power Supply
Power Supply
Disk Drive
Disk Drive
Disk Drive
Disk Drive
Disk Drive
Disk Drive
Disk Drive
Bay 0
Bay 8
Przeglądanie stron 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 50 51

Komentarze do niniejszej Instrukcji

Brak uwag